Project: Cott Beverages

Location: West Yorks

Work carried out: The installation of inlet and outlet headers to 5 new Water Softeners. The project was carried out in two stages due to the client's production requirements.

All flow meters, pneumatic and manual butterfly valves installed and the systems pressure tested. All pipework material was ABS Plastic with stainless steel brackets.

The installation of  inlet and outlet headers to  5 new  Water Softeners

The installation of  inlet and outlet headers to  5 new  Water Softeners

The installation of  inlet and outlet headers to  5 new  Water Softeners

Latest News

Energy Project in Wales

We have completed a project in Wales for an energy company. The project included replacing the existing valves and pipe work on a Hydro Electric Pow… Read more

Posted: Tue 01-Nov-2011 8:15AM

North Sea Oil and Gas Project

We are working closely with a local company who supply valves to the oil and gas industry. The project included modifying large diameter valves whic… Read more

Posted: Tue 01-Nov-2011 8:15AM