Project: Cott Beverages

Location: West Yorks

Work carried out: The installation of inlet and outlet headers to 5 new Water Softeners. The project was carried out in two stages due to the client’s production requirements.

All flow meters, pneumatic and manual butterfly valves installed and the systems pressure tested. All pipework material was ABS Plastic with stainless steel brackets.

Cotts1
Cotts2
Cotts3