Project: Sterigenics UK Ltd

Location: Alfreton Derbyshire

Work carried out: Installing a new sterilizing chamber and prefabricated equipment. Service Pipework material range from 8mm copper to 6″Jacketed stainless steel. Steam heat tracing was installed on the Ethylene Oxide systems. Thermal Insulation was required on all pipework. Total Value Approx: 100k

St1
St2
St3